Having the manual would be a big help, but I'll give you an overview. I have only ever dealt with aircooled units so I probably wont caver everything you need.
remove carb/choke linkeage, fuel line dizzy leads, starter power cable (and secondary) clutch cable and you've got most of the fiddly items sorted.
clutch cable securing bolt is very awkward, if you have a 13mm ratchet spanner it will help alot
with the car on the ground access the 4 drive shaft hub bolts for each wheel located at the end of each drive shaft. you can only see 2 at a time, so being able to roll the car back/forward allows you to reach them all pretty quickly.
at the very front of the gearbox disconnect the gear linkage (10mm & 13mm spanner) also unscrew the speedo cable.
Jack up and support the engine and box a jack under each is best if you can.
Undo the gearbox mounts
undo the rear panel
lower the jacks and roll the car forward (this is usually when you realise you haven't disconnected everything!
With a bit of practise it can be done in about 30 mins
Hope this helps
Michael